UK-wide · Free site survey and fixed written quote for new doors · Repair and service visits priced before we attend

Call 0800 088 6248

Automatic Door Installers

Curved automatic doors · Somerset

Curved automatic doors in Bath

Thinking of replacing a tired revolving or flat sliding entrance in Bath with a curved door? We look at the structure, the space outside and the traffic at a free survey, then explain the options and a realistic lead time.

Town
Bath
Area
Somerset
Postcodes
BA1, BA2
Guide price
From £14,995 ex VAT
  • Free site survey for new doors
  • Fixed, itemised written quote
  • Set up with reference to BS EN 16005
  • England, Wales, Scotland and NI
  • Guide prices published

Covering Bath and nearby

If your building is in Bath, or anywhere in the BA1 and BA2 postcode districts, we can arrange curved automatic doors. Visits are booked with you in advance, timed around opening hours where that matters, and carried out by engineers who work under our management.

Business parks around Bath tend to have reception doors that see steady rather than heavy traffic, often with access control after hours. A swing or sliding operator linked to a card reader or intercom is a common arrangement for entrances like these.

Nearby towns we also list for curved automatic doors (straight-line distance): Keynsham (6.4 miles), Trowbridge (7.7 miles), Kingswood (8.3 miles), Melksham (9.6 miles), Fishponds (10.1 miles), Frome (10.3 miles).

What to think about for curved automatic doors in Bath

  • The floor must be level across the whole arc, and the matwell and floor finish need cutting to the same radius as the guides. Coordinate the floor layer with the door programme so the curves match.
  • Listed buildings and conservation areas in Bath may need consent for a curved entrance. Drawings showing the radius, frame colour and canopy detail help the planning authority understand the proposal.
  • Curved doors on landmark buildings in Bath are often lit at night. Plan canopy lighting, signage and any warm air curtain alongside the door, so cables and fixings are in place before the glass goes in.
  • Curved glass cannot be cut to size on site. Allow for the longer lead time in any refurbishment programme, and do not book shopfitters or floor layers for the entrance until the door has a delivery date.
  • A full-round door needs a roof or canopy that can be supported and drained. On exposed sites across Somerset, think about how rainwater will leave the canopy without running down the glass into the threshold.

Curved automatic doors in Bath: guide prices

The site survey is free, including the measured drawing and a fixed, itemised written quote. Guide price: from £14,995 ex VAT.

ItemGuide priceNotes
Half-round curved sliding entrancefrom £14,995installed, ex VAT; priced on survey
Full-round curved entrance or large radiusPriced on surveyglass and track are made to the radius
Battery backup for power-cut operation£395 – £695per door, ex VAT
Card or fob reader tied into the door£795 – £2,495per door, ex VAT

Curved doors are designed and priced after a free site survey, because the glass, track and screens are made to the radius of your entrance.

Standards and rules in England

Under the Equality Act 2010, service providers and employers must make reasonable adjustments for disabled people, which can include altering a physical feature such as a heavy entrance door. New entrances and some alterations count as building work, so check with building control before the work is ordered.

Building regulations guidance in England (Approved Document M, Volume 2) says a powered opening system should be used where a self-closing entrance door would need more than 30 N at the leading edge to open, or more than 22.5 N between 30° and 60°, and expects external doors used by the public in new buildings to give at least 1000 mm of effective clear width.

How it works

  1. Describe what you need. Whether the job is curved automatic doors for a busy entrance or for a single internal door, a brief description and some photos let us understand it and plan a survey visit in Bath.
  2. Free visit to the site. An engineer working under our management assesses the opening, the existing door and frame, the floor and the electrical supply, and notes any access, consent or timing issues to plan around.
  3. Your fixed quotation. The quote is fixed for the work it describes and lists each item, including any removal, making good and electrical work. It also states the lead time, the payment stages and the warranty terms.
  4. Fitting and sign-off. Work goes ahead on dates agreed with you. Once fitted, the door is adjusted and its safety functions are tested and recorded with reference to BS EN 16005, and you are shown how to use it.

To replace a tired entrance in Bath with a curved door, tell us the width, the depth available in front of the building and how busy it gets.

Curved automatic doors in Bath: questions

How long does a curved door project in Bath take?

Curved doors are typically 8 to 14 weeks from order once the drawings are approved, because the glass and frame are made to your radius. Installation then usually takes two to four days for a half-round door, and longer for a full-round door with a roof. The quote sets out the expected programme for your building.

How are prices worked out for curved automatic doors in Bath?

Our guide starts from £14,995 excluding VAT (per entrance), the same guide price we use across the UK. The free site survey in Bath confirms the price as a fixed, itemised written quote, and the guide price tool gives you a range before anyone visits.

Can you work with our architect or main contractor in Bath?

Yes. Many curved doors are part of a larger refurbishment or new build. We can work from the architect's setting-out drawings, agree the structural opening, canopy and floor details with the contractor, and fit the door at the right stage of the programme so finished floors and glazing are protected.

Do you install curved automatic doors in Bath?

Yes. We arrange half-round, full-round and segmental curved doors for buildings in Bath and across Somerset. The survey, installation and commissioning are carried out by specialist automatic door engineers working under our management, and we remain the contracting party from the first drawing to handover.

What is the lead time for curved automatic doors in Bath?

Lead times depend on the door type and what has to be made to order. As a guide, operators and accessible door kits are typically two to four weeks from order, and complete sliding entrances typically four to eight weeks from drawing approval. Curved, revolving and hermetic doors usually take longer. The expected lead time is stated in your quote.

What do you need from us for parking and access in Bath?

Somewhere for the engineer's van as close to the entrance as possible, and a clear working area around the door. If parking is restricted, loading rules apply or the site has security procedures, tell us when you book. Those details go into the plan so the visit is not held up on the day.

Who is responsible for automatic doors on escape routes in Bath?

Under the Regulatory Reform (Fire Safety) Order 2005 the responsible person for the premises must make sure escape routes work and fire safety equipment is maintained. Automatic doors on an escape route need fail-safe opening or break-out, set by the fire strategy.

Next step

Curved automatic doors in Bath

Send the address, a photo if you have one and what the door needs to do. New installations get a free site survey and a fixed written quote; repairs and servicing are priced in writing before we attend.