UK-wide · Free site survey and fixed written quote for new doors · Repair and service visits priced before we attend

Call 0800 088 6248

Automatic Door Installers

Revolving doors · Cambridgeshire

Revolving doors in March

Choosing between a manual and an automatic revolving door for a building in March? Our free site survey looks at traffic, visitors and space, and explains the three- and four-wing options before you commit to anything.

Town
March
Area
Cambridgeshire
Postcodes
PE15
Guide price
Typically £29,995 to £59,995 ex VAT
  • Free site survey for new doors
  • Fixed, itemised written quote
  • Set up with reference to BS EN 16005
  • England, Wales, Scotland and NI
  • Guide prices published

Covering March and nearby

From shops and surgeries to schools, care homes and private houses, any building in the PE15 postcode district can be covered for revolving doors. Specialist engineers working under our management carry out the work, and you deal with us as the contracting party from start to finish.

Libraries, health centres and council buildings in March still need accessible entrances, whatever their size. A single automatic door with a push pad or touch-free switch is often enough to give everyone easy access.

Nearby towns we also list for revolving doors (straight-line distance): Wisbech (8.5 miles), Ely (12.8 miles), Peterborough (14.2 miles), King's Lynn (18.9 miles), Spalding (19.1 miles), Huntingdon (19.2 miles).

What to think about for revolving doors in March

  • The fire strategy decides how people will escape. Agree with your fire risk assessor where the pass door and other exits will be before the revolving door is designed.
  • Hotel entrances in March see guests with large cases and families with pushchairs. A larger three-wing automatic door and a clearly signed pass door keep the flow moving.
  • Plan the pass door first. Wheelchair users, pushchairs and deliveries need an accessible powered door beside the drum, and it should be easy to find from the street in March, with clear signs.
  • Revolving doors with curved glass drum walls have longer lead times. Allow for them in any refurbishment programme across Cambridgeshire, and confirm dates before booking floor layers or shopfitters.
  • Busy reception areas in March may want to keep people moving during installation week. A second entrance, temporary signs and staged work all help visitors find their way in.

Revolving doors in March: guide prices

The site survey is free, including the measured drawing and a fixed, itemised written quote. Guide price: typically £29,995 to £59,995 ex VAT.

ItemGuide priceNotes
Manual revolving doorfrom £14,995installed, ex VAT; priced on survey
Automatic revolving door, three or four wings, about 2.1 m diameter£29,995 – £59,995installed, ex VAT
Large-diameter or high-capacity revolving doorsPriced on surveyoften with a side swing or sliding door alongside
Side door for wheelchair users, prams and escapesee sliding and swing doorsusually needed alongside a revolving door

Standards and rules in England

Building regulations guidance treats revolving doors as not accessible on their own, so an accessible powered swing or sliding door should be provided alongside. In England, fire safety law says sliding or revolving doors must not be used for exits specifically intended as emergency exits.

In Great Britain a new or converted powered door must meet the Supply of Machinery (Safety) Regulations 2008 before it is first used, and can carry the UKCA or the CE marking. Workplace law (the Workplace (Health, Safety and Welfare) Regulations 1992) expects powered doors to have suitable and effective features to stop them trapping anyone and, where needed for safety, to open by hand unless they open automatically if the power fails. Doors at work must also be kept in efficient working order under a suitable system of maintenance.

How it works

  1. Start with a short enquiry. Use the form, phone or email. Tell us whether the work is a new door, an upgrade or an opener for a home, and we arrange the next step for your site in March.
  2. Measured survey. The free survey confirms what will fit and what the entrance needs: opening width, door type, activation, safety sensors and behaviour on power loss or fire alarm, matched to how the building is used.
  3. Written price, no surprises. A fixed, itemised quote sets out the specification, the work involved, the expected lead time and the warranty terms. You can ask questions or change the specification before accepting it.
  4. Installed and commissioned. The door is installed with as little disruption as possible, then set up and tested for its hazard zones. Before leaving, the engineer explains the controls and hands over the documents for your records.

To cut draughts at a busy entrance in March, talk to us about revolving doors. The survey is free and there is no obligation.

Revolving doors in March: questions

How long does a revolving door project in March take?

Revolving doors are typically 8 to 14 weeks from order, once drawings are approved. On site, an automatic revolving door usually takes several days, covering floor preparation, drum and canopy, wings, drive and commissioning. We agree the programme with you and plan how visitors will get in while the work is done.

What is the guide price for revolving doors in March?

Our guide is £29,995 to £59,995 excluding VAT (per automatic door), the same guide prices we use across the UK. The free site survey in March confirms the price as a fixed, itemised written quote, and the guide price tool gives you a range before anyone visits.

Who services a revolving door in March after installation?

We can, with each visit priced in writing before an engineer attends. Revolving doors should have their safety sensors, stop buttons and wing edges checked by a trained engineer at least once a year, and busy entrances usually need more frequent visits. Staff should also make simple daily checks and keep a record.

Is the survey for a revolving door in March free?

Yes. For a new revolving door and pass door, the survey costs nothing and carries no obligation. We look at the space, structure, floor, traffic and fire strategy, then send drawings and a fixed, itemised written quote. Each item is listed separately, which makes it easy to compare with other quotes.

What should I send before the survey in March?

A few photos of the door from inside and outside, rough measurements of the opening, the address and a note of how the entrance is used. If the door already has an operator, a photo of any label on it helps. With that, the engineer arrives prepared, the survey takes less of your time and we can put the quote for revolving doors together more easily.

What is the lead time for revolving doors in March?

Lead times depend on the door type and what has to be made to order. As a guide, operators and accessible door kits are typically two to four weeks from order, and complete sliding entrances typically four to eight weeks from drawing approval. Curved, revolving and hermetic doors usually take longer. The expected lead time is stated in your quote.

Which building regulations apply to a new automatic entrance in March?

In England the guidance is Approved Document M (Volume 2) for access, Approved Document B for fire safety and escape routes, and Approved Document K for glazing and powered doors. A new entrance can count as building work, so building control should be involved before it is ordered.

Next step

Revolving doors in March

Send the address, a photo if you have one and what the door needs to do. New installations get a free site survey and a fixed written quote; repairs and servicing are priced in writing before we attend.